Solar

Harvesting the Sun Creates Challenges for Solar Farms

A mid-September community meeting in New York’s Greene County drew a crowd of more than a hundred local citizens with opinions about a 50 megawatt (50MW) solar facility proposed on active farmland in the town of Coxsackie. Billed as a public forum, the meeting was, in fact, controlled by opponents of the project. Misinformation was rampant and those wishing to speak in support of the project were silenced or shouted down. At the center of this proposal is a 1,200-acre farm site, of which 933 acres have been leased by the developer.